01 Home
19 Copyright
25 Advertisers
31 FAQs
29 Abbreviations
Abbreviation |
Definition |
Approx |
Approximately |
Beg |
Beginning |
CC |
Contrasting color |
Cables |
When naming cables, the format used is as follows: |
Cont |
Continue |
Dec |
Decrease |
Dpn(s) |
Double pointed needle(s) |
Inc |
Increase |
K |
Knit |
K tbl |
Knit through back loop |
Kwise |
Knitwise, or as if to knit |
K2tog |
Knit 2 together (right slanting decrease) |
K3tog |
Knit 3 together |
Kfb |
Knit into the front and into the back of the next stitch |
MB |
Make bobble |
MC |
Main Color |
M1 |
Make 1 |
Mm |
Millimeter(s) |
P |
Purl |
P2tog |
Purl 2 together |
P3tog |
Purl 3 together |
Patt(s) |
Pattern(s) |
Pfb |
Purl into the front and into the back of the next stitch |
Pm |
Place marker; on subsequent rows, pass marker |
Psso |
Pass slipped stitch over |
Pwise |
Purlwise, or as if to purl |
Rem |
Remaining |
Rev St st |
Reverse Stockinette Stitch |
RS |
Right side |
Rnd(s) |
Round(s) |
Sc |
Single Crochet |
Ssk |
Slip 2 sts separately knitwise, insert left needle into the front of the slipped sts and knit them together (left slanting decrease) |
Ssp |
Slip 2 sts separately knitwise, return sts to left needle, p2tog tbl. (right slanting decrease on knit side of work) |
Sl st |
Slip st (crochet) |
St(s) |
Stitch(es) |
St st |
Stockinette Stitch |
Tbl |
Through back loop |
Tog |
Together |
W & T |
Wrap and turn |
WS |
Wrong side |
WYIB |
With yarn in back |
WYIF |
With yarn in front |
YO |
Yarn over |
* |
Repeat instructions from '*' to ';' as many times as specified. |
© Copyright Petite Purls 2011